Department of Civil, Environmental and Natural Resources Engineering

  1. 2015
  2. Published

    Recycling process water in complex sulfide ore flotation: Effect of calcium and sulfate on sulfide minerals recovery

    Ikumapayi, F. & Kota, H. R. 2015 In : Mineral Processing and Extractive Metallurgy Review. 36, 1, p. 45-64 20 p.

    Publication: Research - peer-reviewJournal article

  3. Published

    Recycling Process Water in Complex Sulphide Ore Flotation: Effect of Calcium and Sulphate on Sulphide Minerals Recovery

    Ikumapayi, F. & Kota, H. R. 2015 In : Mineral Processing and Extractive Metallurgy Review. 36, 1, p. 45-64 20 p.

    Publication: Research - peer-reviewJournal article

  4. E-pub ahead of print

    Reliability Analysis for Preventive Maintenance based on Classical and Bayesian Semi-parametric Degradation Approaches using Locomotive Wheel-sets as a Case Study

    Lin, J., Pulido, J. & Asplund, M. 2015 In : Reliability Engineering & System Safety.

    Publication: Research - peer-reviewJournal article

  5. Published

    Sources and remediation techniques for mercury contaminated soil

    Xu, J., Bravo, A. G., Lagerkvist, A., Bertilsson, S., Sjöblom, R. & Kumpiene, J. 2015 In : Environment International. 74, p. 42–53 12 p.

    Publication: Research - peer-reviewJournal article

  6. 2014
  7. Submitted
  8. In press

    Structural Identification of Civil Engineering Structures

    Edrees, T. Nov 2014 135 p.

    Publication: ResearchLicentiate thesis

  9. Published

    Al-Batin Alluvial Fan, Southern Iraq

    Sissakian, V., Shihab, A., Al-Ansari, N. & Knutsson, S. 28 Oct 2014 In : Engineering. 6, 11, p. 699-711 13 p.

    Publication: Research - peer-reviewJournal article

  10. Published

    Meandering of Tributaries of the Tigris River Due to Mass Movements within Iraq

    Sissakian, V., Abduljab'bar, M., Al-Ansari, N. & Knutsson, S. 28 Oct 2014 In : Engineering. 6, 11, p. 712-730 19 p.

    Publication: Research - peer-reviewJournal article

  11. Published

    A proactive plan-do-check-act approach to defect management based on a Swedish construction project

    Lundkvist, R., Meiling, J. & Sandberg, M. 24 Oct 2014 In : Construction Management and Economics. 32, 11, p. 1051-1065 15 p.

    Publication: Research - peer-reviewJournal article

  12. Published

    Operation and maintenance performance of rail infrastructure: Model and Methods

    Stenström, C. 21 Oct 2014 224 p. (Doctoral thesis / Luleå University of Technology).

    Publication: ResearchDoctoral thesis

Previous 1 2 3 4 5 6 7 8 ...867 Next